RPC designed, built and supported a utility to transfer data from a legacy time capture system to update Primavera P6 with period cumulative values. The utility uses the Primavera API and can be manually or automatically scheduled to run.
Process
The client provided a multi project Excel spreadsheet containing the values to be imported. When scheduled or called to be run, the utility:
A bespoke P6 properties XML is used to record entry keys to identify where data is stored including, database connection parameters, log files, utility features etc.
Error Checking and Reconciliation
The utility carries out a number of error checks:
Testing and Training
Full end-to-end testing was carried out simulating the process in a live environment capturing both successful and 'known failure' scenarios.
On site knowledge transfer was carried out to ensure the end user could confidently run the process with the minimum of support.
Documentation
Full end user documentation was provided.
Support
RPC provides an annual support contract ensuring the future proofing and forward compatibility of the utility.